caldx · Narrative Editor
aircraft
Business value · cost avoided
$865,000
by catching the vibration drift on day 2 and swapping the bearing on a scheduled ground turn — instead of an unplanned AOG on day 14.
18 h × $30k/h = $540,000 downtime + $250,000 cargo at risk + $75,000 SLA penalty − $28k planned swap · nets out
Caught · planned swap
Part ordered day 2 · fitted on a scheduled ground turn · 0 h AOG
$28k
Status quo · unplanned AOG
Bearing fails day 14 · 18 h grounded · cargo & SLA exposed
$865k
Graph — the story as a dependency graph click a node to inspect
Timeline — relative to T0 (now) drag a pin to set offsetHours
╱╱

Clickable hi-fi mockup with the real Freighter-01 APU Bearing narrative loaded · sample data, not a running build · palette drag & pin drag shown as affordances only.